• Home
  • News
    • Local
    • Lansing Bureau
    • Washington D.C. Bureau
    • National
    • Insights
    • Watch 19 News Live
    • CBS News Live
    • Report News
  • Weather
    • Forecast + Conditions
    • Current Alerts
    • Interactive Radar
    • Cameras
    • Share Photos/Videos
    • Closings and Delays
  • Sports
  • Features
    • America 250
    • Medical Minute
    • Life in the 906
    • Creature Feature
    • The Yooper Goddess
WZMQ 19 News | CBS | MeTV Marquette
Cloudy

Marquette
Cloudy 36°

Partly Cloudy

Escanaba
Partly Cloudy 43°

Cloudy

Houghton
Cloudy 39°

Cloudy

Iron Mountain
Cloudy 41°

Watch
No Result
View All Result
  • Home
  • News
    • Local
    • Lansing Bureau
    • Washington D.C. Bureau
    • National
    • Insights
    • Watch 19 News Live
    • CBS News Live
    • Report News
  • Weather
    • Forecast + Conditions
    • Current Alerts
    • Interactive Radar
    • Cameras
    • Share Photos/Videos
    • Closings and Delays
  • Sports
  • Features
    • America 250
    • Medical Minute
    • Life in the 906
    • Creature Feature
    • The Yooper Goddess
WZMQ 19 News | CBS | MeTV Marquette
No Result
View All Result
WZMQ 19 News | CBS | MeTV Marquette
No Result
View All Result

4 Weather Alerts

View Details »

Insights: Ishpeming to begin $16M sewer infrastructure project April 22

by Sarah Blakely
April 18, 2024
A A

ISHPEMING, Mich. – The City of Ishpeming today announced construction is scheduled to begin on April 22, 2024 on a more than $16 million sewer infrastructure project. The Clean Water State Revolving Fund (CWSRF) project construction will begin near the Marquette County Road Commission at the corner of North Second Avenue and Ash Street. Work will proceed to Ash Street, Hickory Street and Hemlock Street. Construction in these areas is anticipated to last 3-4 weeks.  

Residents should expect disruptions to traffic patterns during construction activities. Access to homes and businesses will be maintained throughout construction.

The CWSRF project, first announced in September 2023, will include a combination of several components of the City Sanitary Sewer Infrastructure including sewer main replacement, installation of a redundant main and necessary upgrades to lift stations to provide a long-term solution to its aging infrastructure.

As work progresses, key updates will be provided. While not anticipated to last this long, the funding timeline allows for the total project to be completed no later than December 31, 2026. 

“This project will update critical infrastructure which is more than 70 years old. Improvements will address many challenges facing our community,” said Ishpeming City Manager Craig Cugini. “Updating this aged system will provide long-lasting, reliable new systems using the most up-to-date materials and technology. These improvements are expected to reduce unnecessary strain on the treatment plant systems often occurring during high water events.”

The project includes $8.025 million in grant funding through the American Rescue Plan and an $8.025 million municipal bond from EGLE through federal Clean Water State Revolving Fund (CWSRF) funding.

The full scope of this project includes approximately 25,000 feet of sewer main being replaced or rehabilitated. To mitigate community impact, the City will require that any roads undergoing work are repaved before winter, as well as ensure contractors adhere to the City’s “dig once” policy, allowing any other necessary underground work to be performed parallel to prevent cutting through pavement and dirt multiple times. “Dig once” benefits include long-term cost savings, efficient use of resources and reduced burden on residents near a work site. 

This project should make meaningful progress on outstanding infrastructure needs, including:

  • -Installation of new PVC pipe via open cut throughout the city
  • -Reinforcing existing pipes located in wetlands, the Carp River and other sewers where open cut is impractical
  • -Backup generators and pump replacements for all eight lift stations
  • -A new, 30-inch diameter Carp River sewer crossing installed via directional drilling that will provide a redundant crossing, which is critical in times of high water and heavy flow

The City has enrolled two companies that are either headquartered or located locally to assist with this undertaking. The contractor for the project is Payne and Dolan, which has an office in Ishpeming, and the engineer is U.P. Engineers and Architects, which is based in Ishpeming.

Add as Preferred Source on Google

More

News

Insights: Plantchella returns to the U.P. State Fairgrounds May 9

April 28, 2026
News

Much of Escanaba’s Ludington Street closed for sewer work and streetscape reconstruction

April 27, 2026
Feature

Insights: Iron Mountain DDA preparing for small business week in May

April 24, 2026
Feature

Insights: U.P. Regional Labor Federation to honor fallen workers in Ishpeming April 28

April 23, 2026
News

Insights: Easton Zivnoska details upcoming trip to Africa

April 22, 2026
News

Annual Esky Cleanup put on hold due to downtown construction

April 22, 2026 - Updated on April 23, 2026
Next Post

The City of Ironwood receives $11.4 Million grant for water filtration systems

New leadership and budget plans unveiled at Northpointe Behavioral Health board meeting

  • Home
  • News
  • Weather
  • Sports
  • Features
  • Events
  • Programming
  • Station
WZMQ CBS | 19 News

© 2026 WZMQ, LLC | FCC Public File | EEO Report

No Result
View All Result
  • Home
  • News
    • Local
    • Lansing Bureau
    • Washington D.C. Bureau
    • National
    • Insights
    • Watch 19 News Live
    • CBS News Live
    • Report News
  • Weather
    • Forecast + Conditions
    • Current Alerts
    • Interactive Radar
    • Cameras
    • Share Photos/Videos
    • Closings and Delays
  • Sports
  • Features
    • America 250
    • Medical Minute
    • Life in the 906
    • Creature Feature
    • The Yooper Goddess
  • Events
  • Programming
    • Programming Guide
    • CBS
    • MeTV
    • Start TV
    • Heroes & Icons
    • Court TV
    • ION
  • Station
    • About Us
    • Community Involvement
    • Mobile App
    • Meet the Team
    • Contact
    • Careers
    • Advertising
    • Request Copy of Story
    • FCC Public File
    • EEO Report
No Result
View All Result
  • Home
  • News
    • Local
    • Lansing Bureau
    • Washington D.C. Bureau
    • National
    • Insights
    • Watch 19 News Live
    • CBS News Live
    • Report News
  • Weather
    • Forecast + Conditions
    • Current Alerts
    • Interactive Radar
    • Cameras
    • Share Photos/Videos
    • Closings and Delays
  • Sports
  • Features
    • America 250
    • Medical Minute
    • Life in the 906
    • Creature Feature
    • The Yooper Goddess
  • Events
  • Programming
    • Programming Guide
    • CBS
    • MeTV
    • Start TV
    • Heroes & Icons
    • Court TV
    • ION
  • Station
    • About Us
    • Community Involvement
    • Mobile App
    • Meet the Team
    • Contact
    • Careers
    • Advertising
    • Request Copy of Story
    • FCC Public File
    • EEO Report
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our privacy policy.