• Home
  • News
    • UP 200
    • Local
    • Lansing Bureau
    • Washington D.C. Bureau
    • National
    • Insights
    • Watch 19 News Live
    • CBS News Live
    • Report News
  • Weather
    • Forecast + Conditions
    • Current Alerts
    • Interactive Radar
    • Cameras
    • Share Photos/Videos
    • Closings and Delays
  • Sports
  • Features
    • Life in the 906
    • The Yooper Goddess
WZMQ 19 News | CBS | MeTV Marquette
Cloudy

Marquette
Cloudy 23°

Cloudy

Escanaba
Cloudy 27°

Cloudy

Houghton
Cloudy 25°

Cloudy

Iron Mountain
Cloudy 23°

Watch
No Result
View All Result
  • Home
  • News
    • UP 200
    • Local
    • Lansing Bureau
    • Washington D.C. Bureau
    • National
    • Insights
    • Watch 19 News Live
    • CBS News Live
    • Report News
  • Weather
    • Forecast + Conditions
    • Current Alerts
    • Interactive Radar
    • Cameras
    • Share Photos/Videos
    • Closings and Delays
  • Sports
  • Features
    • Life in the 906
    • The Yooper Goddess
WZMQ 19 News | CBS | MeTV Marquette
No Result
View All Result
WZMQ 19 News | CBS | MeTV Marquette
No Result
View All Result

WATCH LIVE: WZMQ 19 News »

Weather delays completion of Mackinac Bridge work

by Lily Simmons
May 15, 2025
A A
Courtesy: Mackinac Bridge Authority

Courtesy: Mackinac Bridge Authority

ST. IGNACE, Mich. (WZMQ) – The end of a project on the Mackinac Bridge has been delayed due to weather conditions.

According to the Bridge Authority, cold, rainy weather early in the season has delayed the completion of this year’s work to repave portions of the Mackinac Bridge and replace a modular joint, which will result in extended lane closures.

While contractors have completed the replacement of half of the modular joint over Pier 34 at the start of the north viaduct span, as well as repair and repaving the southbound lanes of the north viaduct, work continues to replace the other half of the modular joint on the northbound lanes of the bridge. That work is currently expected to be completed by May 29, which is about a week later than originally anticipated.

“We worked with the contractor to ensure that the planned work could be completed prior to the Memorial Day weekend, but poor weather conditions delayed this year’s start of work and the modular joint installation took longer than expected,” said Bridge Director Kim Nowack. “Unfortunately, this means that there will be lane closures in place for the holiday weekend, but crews are working diligently to wrap the project up and get those lanes reopened.”

Weekend traffic peaks between 10 a.m. and 4 p.m., often resulting in traffic backups even when all toll lanes are open. Drivers are advised to consider crossing at off-peak times or prepare for delays.

“While Memorial Day weekend typically marks the seasonal increase in traffic volumes on the bridge, we fortunately did not see backups during last year’s work, and traffic flowed smoothly,” Nowack said. “We hope that will be the case this holiday weekend.”

To ensure the work is completed prior to the seasonal rise in traffic volumes on the bridge, the scope of work for this season was reduced. Deck repairs and repaving of the remaining sections of the southbound side of the bridge will be scheduled at a later date as a separate project.

Last year, the northbound side of the bridge was repaired and repaved. While scheduled for completion prior to Memorial Day 2024, work and lane closures extended into mid-June.

Get WZMQ 19 anytime, anywhere

Download the app

AppleAndroid

Watch on TV

RokuFire TVZeam

Connect on social media

FacebookTwitterInstagram

More

News

Escanaba Public Safety addresses community concerns regarding recent fires

December 11, 2025
Jen's Gems by Peach is located at 1628 Ludington Street
News

Jen’s Gems by Peach to host free House of Ludington fire relief event

December 11, 2025
News

Michigan House Advances Bills on Shoreline Cleanup, Butter Grading, and Indiana Border Survey

December 10, 2025 - Updated on December 11, 2025
News

Marquette Regional History Center holds 2025 Holiday Open House

December 10, 2025 - Updated on December 11, 2025
News

WNMU-TV receives stabilization grant from Public Media Bridge Fund

December 10, 2025 - Updated on December 11, 2025
News

Escanaba community responds to call for Angel Tree supporters

December 10, 2025 - Updated on December 11, 2025
Next Post

U.P. Trappers Convention & Outdoor Expo returns to Escanaba in July

Superior Central begins summer sinking fund projects

  • Home
  • News
  • Weather
  • Sports
  • Features
  • Events
  • Programming
  • Station
WZMQ CBS | 19 News

© 2025 WZMQ, LLC | FCC Public File | EEO Report

No Result
View All Result
  • Home
  • News
    • UP 200
    • Local
    • Lansing Bureau
    • Washington D.C. Bureau
    • National
    • Insights
    • Watch 19 News Live
    • CBS News Live
    • Report News
  • Weather
    • Forecast + Conditions
    • Current Alerts
    • Interactive Radar
    • Cameras
    • Share Photos/Videos
    • Closings and Delays
  • Sports
  • Features
    • Life in the 906
    • The Yooper Goddess
  • Events
  • Programming
    • Programming Guide
    • CBS
    • MeTV
    • Start TV
    • Heroes & Icons
    • Court TV
    • ION
  • Station
    • About Us
    • Community Involvement
    • Mobile App
    • Meet the Team
    • Contact
    • Careers
    • Advertising
    • Request Copy of Story
    • FCC Public File
    • EEO Report
No Result
View All Result
  • Home
  • News
    • UP 200
    • Local
    • Lansing Bureau
    • Washington D.C. Bureau
    • National
    • Insights
    • Watch 19 News Live
    • CBS News Live
    • Report News
  • Weather
    • Forecast + Conditions
    • Current Alerts
    • Interactive Radar
    • Cameras
    • Share Photos/Videos
    • Closings and Delays
  • Sports
  • Features
    • Life in the 906
    • The Yooper Goddess
  • Events
  • Programming
    • Programming Guide
    • CBS
    • MeTV
    • Start TV
    • Heroes & Icons
    • Court TV
    • ION
  • Station
    • About Us
    • Community Involvement
    • Mobile App
    • Meet the Team
    • Contact
    • Careers
    • Advertising
    • Request Copy of Story
    • FCC Public File
    • EEO Report
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our privacy policy.